Image
SCIOS scope 2

SCIOS scope 2 
inspection of hot water boilers and air heaters with fan burners

INTRODUCTION

The SCIOS certification requires periodic inspection of the maintenance status of combustion plants. Thus, an employer can intervene on time if safety risks arise. These are installations with more than 100 kW of rated thermal input power powered by gaseous fuel, and solid fuel-fired installations with more than 20 kW of rated thermal input power.

The Foundation for the Certification of Inspection and Maintenance of Combustion Plants (SCIOS - Stichting Certificatie Inspectie en Onderhoud Stookinstallaties) manages the certification scheme. It describes who carries out the first or special inspection (EBI - eerste of bijzondere inspectie), periodic maintenance (PO - periodiek onderhoud) and periodic inspections (PI - periodieke inspecties) on the combustion plants, and how this is done. In case of new installations and existing installations without a basic report (BV - basisverslag), an EBI (VISA inspector) must draw up this basic report himself. In addition, an installation file is required for each installation.

Bureau Veritas Industrial Services is part of Bureau Veritas Inspection and Certification The Netherlands B.V. We are a recognized and certified SCIOS body for the execution of PIs and EBIs and have skilled and qualified SCIOS inspectors (EBIs). They have extensive experience with the business and production processes in your industry.

Would you like a quote right away or do you have questions for sales?

contact us 💬

Scope 2 - INSPECTION OF Hot water boilers and air heaters with fan burners

Bureau Veritas takes the TD3 technical documentation as a starting point for the scope 2 SCIOS inspection. This states which minimum requirements the inspection must meet. Bureau Veritas also knows everything about determining the share of the heat recovery plants on site. These calculations can be included as added value in the report.

INSPECTION METHODOLOGY

The inspection is carried out in accordance with the SCIOS Certification Scheme and the Sub-Regulation for Combustion Plants. Bureau Veritas collects relevant data during a visit, and during the inspection day(s). We do this through a visual inspection and measurement and testing checks. We process this data in a report. Upon approval, you will receive the report and the SCIOS certificate.